Workflow user guide

Workflows are automation process algorithms. They describe the flow of the automation by determining which tasks to run and when to run these tasks. A task is an operation (implemented by a plugin), or other actions including running arbitrary code. Workflows are written in Python, using a dedicated framework and APIs.

In this guide you will learn:

Execute workflows

For the main solution blueprint you deployed, you must run the Install workflow. Once your blueprint installs, you will see multiple deployments created automatically. The list of workflows will change and display only applicable workflows that you can run for each deployment type.

  1. Click Deployments, and next to the main Gilan deployment, click menuIcon_use.
  2. Select the Install workflow, and then click Execute. Once your install workflow completes, you will see a list of auto-created deployments which have workflows applicable to those deployments. The following table describes ALL the available VNFM workflows; however, this list will change depending upon the deployment for which you are executing the workflow:
Workflow Run on deployment types Used for
Generate report Gi-LAN or Gi-Firewall only Creating a resource-throughput usage report to send to F5 for billing purposes. Parameter includes full_historical_report a boolean value that when set to true will generate a full report (generating data beyond the default of the previous 180 days).
Heal DAG, slave, and layer instances

Healing failing DAG instances, slave instances, and entire layers (but never master instances), by creating a new copy of the reported, dysfunctional instance or layer.

If you enabled CGNAT, the heal layer workflow will also check the LSN pool list of the previous (failing) device, merge with the AS3 configuration, and then send the configuration to the new device in the layer.

Install ALL deployment types Installing the target deployment, and lifecycle operations on instances (for example, create and configure start).
Uninstall ALL deployment types Uninstalling the target deployment, freeing allocated resources, and performing uninstall lifecycle operations (for example, stop and delete). This workflow also removes deployments and blueprints created during the install workflow. Parameter includes ignore_failure, which passes the workflow upon a failed lifecycle operation.
Purge Layer VNF_layer Uninstalling and removing dysfunctional VNF layer instances. Start this workflow manually, after the heal layer workflow runs and the problem investigation is finished. Parameter includes ignore failure passed to lifecycle uninstall process (see the following Uninstall workflow).
Purge VE VNF instances Uninstalling and removing dysfunctional VNF VE instances, and related objects. Start this workflow manually, after the heal layer workflow runs and the problem investigation is finished. Parameter includes ignore failure passed to lifecycle uninstall process (see the following Uninstall workflow).
Scale In Group vnf_layer, vnf_group

Removing and uninstalling DAG group, adding VEs and the VNF group, adding layers. This workflow finds instances to remove (based on parameters) and uninstalls and removes all specified instances and all related instances. Parameters include:

  • instance ids-JSON encoded list of strings. Each string represents an instance ID, and functions include uninstall and remove instance IDs, and related instances.
  • deployment ids-JSON encoded list of DAG VE and VNF layer deployment IDs to remove. For example, [“dep1”, “dep2”].
  • ignore failure-boolean value passed to the lifecycle uninstall process (see the following Uninstall workflow). If true, then a failed task during the uninstall of an instance will be ignored, and the execution will continue.
  • ignore_not_found-boolean value passed to the lifecycle uninstall process (see the following Uninstall workflow). If true, then the execution will ignore instance IDs and deployment IDs that it cannot find.
  • ignore_limit-boolean value when set to true, the workflow ignores the instance number limit.

Failed execution can have already, partially remove some resources from external systems and remove instances. In this case, execute the workflow again with ignore_failure flag set to true. You must check the VIM and other external systems for leftover, reserved resources.

Scale Out Group vnf_layer, vnf_group Adding DAG group VE instances and VNF group layer instances. Parameter includes add instances, which is the number of new instance VEs to create. If failure occurs due to scaling limits, this does not affect the service. Other failed executions can be a result of resources already reserved to create instances. In this case, remove the failed instance by running the Gilan scale in group workflow [gilan_scale_in_group] and providing the failed (instance id)[instances].
Scale Out Layer vnf_layer, vnf_ve_slave Creating and installing slave nodes to new VNF layer. Parameter includes add instances, which is the number of managed, VNF slave VEs to add to the target deployment. If failure occurs due to scaling limits, this does not affect the service. Other failed executions can be a result of resources already reserved to create instances. In this case, remove the failed instance by running the Gilan scale in layer workflow and providing the failed (instance id)[instances].
Update as 3 VNF_NSD Updating the new JSON encoded as3 declaration pushed to the VE as a part of NSD definition. Run this workflow after editing and your AS3 declaration and uploading your changed, main-solution, blueprint inputs file.
Upgrade (DAG Group) dag_group Enabling the roll-out of a new version of BIG IP in the DAG group. Creating new DAG group of VEs using new software reference data. Workflow selects older VEs with lesser revision value and disables them. Parameter includes instance count, which is the number of instances (DAG VEs) to upgrade.
Upgrade (VNF Group) vnf_group Enabling the roll-out of a new version of BIG IP in VNF group. Creating new VNF layer, using new software reference data, and maintaining the same number of slave VEs as in the selected layer. This workflow will also disable older layers (with lesser revision values). Parameter includes layer deployment id identifying the layer selected for upgrade.
Upgrade Start vnf_group

Starting the upgrade process and setting new software reference data for both DAG group and VNF group. You must provide the revision number and software reference details (image id, flavor) for the hypervisor. The revision number is used during the VNF Layer upgrade process. Parameters include JSON encoded dictionary containing definition of new software:

  • image-for new BIG-IP (for example, BIGIP-13.1.0.7-0.0.1.ALL_1SLOT)
  • flavor-for new BIG IP (for example, f5_small)
  • revision-revision number that is incremented with every upgrade. Instances with revision values lower than the number of the upgrade image provided, is considered as using an old version of the software.

Example: {"data":{"image":"BIGIP-13.1.0.7-0.0.1.ALL_1SLOT","flavor":"f5.cloudify_small"}}

Upgrade Finish vnf_group Finishing the upgrade process for both DAG group and VNF group, using the new software reference data to install scaled and healed VEs, as well as other normal operations. Parameter includes ignore_revision_check a boolean value that when set to true, will ignore the revision values assigned to running instances.
Configuration update VNF member You do NOT run this workflow manually. This workflow is part of the install, upgrade, scale, and heal workflow automation that updates the DAG pool membership with a slave.
Admin state disable VNF_layer Executing this manually on a VNF layer you want to eventually deprecate. This workflow stops new traffic connections (bleeds traffic) on a layer and diverts that traffic to other layers in the data center. For example, you run this workflow in conjunction with the Scale Out and Scale workflows when moving service layers from one data center to another.
Update member VNFD_VNF

Updating the DAG pool membership of a slave during a heal workflow. Parameters include:

  • adminState - the admin state value of the member being updated. Options include: enable, disable, and offline.
  • enable - the enable value for the member being updated. Options include: true or false.
  • servicePort - the service port number assigned to the member being updated.

For example, to disable a member, set adminState to disable, enable to false, and servicePort to 0.

Deregister VNF_slave Executing on a slave node to remove it from the DAG group and manually fail over the traffic to another DAG group. This workflow is an automated process in the Heal and Upgrade workflows.
Promote BIG-IQ only Executing on the BIG-IQ configuration deployment to promote the secondary BIG-IQ in an HA pair, when the primary BIG-IQ fails. Currently, if your VNFM fails to license a BIG-IP, VNFM will display a failure. You must run this workflow manually to promote the secondary BIG-IQ to take over for the failed, primary BIG-IQ.
Increment IPs VNFD and NSD deployments Loading more IP addresses on the appropriate VNF VE, or execute Increment IPs Proxy. This workflow requires no defined parameters. Execute this workflow to increment the IP addresses in the allotment you defined in the the inputs file (increment_ip_number).
Enable cgnat Gi-LAN, Gi-Firewall NSD_VNF

Executing on the main deployment or executing the Enable cgnat on a single nsd deployment when you have NOT enabled CGNAT prior to installing your blueprint solution.

IMPORTANT: You must first edit your AS3 declaration (policyNAT) for enabling CGNAT, execute the Update as 3 workflow, before executing the Enable CGNAT workflow, and defining the following parameters:

  • increment_ip_number - Value by which your IP addresses are added to your deployment, when you run the Increment IP workflow. Default value is 2.
  • ip_ranges_list - IP address range in JSON format for each LSN pool list (for example, ‘192.168.1.100-192.168.1.150’ and ‘192.168.1.155-192.168.1.160’)
  • starting_ip_number - Number of IP addresses initially assigned to each VNF VE. Default value is 5.
  • cgnat_resource_id - Reference/pointer to your NAT source translation pool that you want VNFM to manage and that you defined in your AS3 declaration (policyNAT). For example, “/Sample_22/A1/”.
Update cgnat IPs Gi-LAN or Gi-Firewall Adding more free IP addresses to the CGNAT. Parameters include the list of IP ranges using JSON format; for example, ‘192.168.1.100-192.168.1.150’
Clear inactive deployment IPs Gi-LAN or Gi-Firewall Clearing inactive/unused IPs assigned to undeployed nodes (for CGNAT-enabled).
Clear subnets Gi-LAN or Gi-Firewall [need info] (for CGNAT-enabled).
  1. You can cancel deployments at anytime by clicking the X in the Cancel_use popup workflow notification.
  2. Learn more about which workflows you can run for which deployment types and for specific use case scenarios.

Workflow scenarios

The following scenarios are examples of manually running specific workflows:

Move a layer to a new data center

In this example, a telco has two service areas (SA-1 and SA-2). Service demand has dictated that SA-2 requires more capacity than SA-1. The telco has purchased two 10GB-layers in each SA (layers 1 and layers 2) for a total of four layers. Therefore, in order to increase capacity in one SA-2, first stand up a new (temporary) layer in SA-2, and then bring down a service layer in SA-1. F5 VNFM enables customers to have more layers than originally purchased for a 48-hour grace period. Therefore, this capacity move to a new SA must occur within 48 hours to avoid being charged for the fifth (in this example), additional (temporary) layer in SA-2.

To move a layer from SA-1 to SA-2, manually run the following workflows:

  • Scale Out (SA-2)
  • Admin state disable (SA-1)
  • Scale In (SA-1)
  1. In VNF Manager for the SA-2 where capacity requirements increase, click the Deployments blade, click the VNF Group deployment (for example, vnf_group), at the top of the window click Execute workflow, and then select Scale Out from the list.

  2. On the Execute workflow scale_out popup window, in the add_instances text box, enter the number of new instances you want to add to this group. Default value is 1.

    The scale out workflow stands up a new (fifth) layer in SA-2 where capacity demand has increased.

    _images/scale-out-move.png
  3. Currently, you have five layers. 48 hours before bringing down a layer in SA-1, click the Deployments blade, click the VNF_layer deployment to bring down (layer 2), at the top of the window click Execute workflow, and then select Admin state disable from the list.

    This workflow bleeds new traffic from the VNF layer 2, preventing all new traffic connections, and diverts all new traffic to layer 1 in SA-1. Keep this layer in Admin state disable for approximately 40 hours, allowing all existing connections on layer 2 to finish before bringing down that layer.

    _images/ASD-move.png
  4. Near the 48-hour threshold, in SA-1, click the Deployments blade, click the VNF_layer deployment to bring down (layer 2), at the top of the window click Execute workflow, and then select Scale In from the list.

  5. On the Execute workflow scale_in popup window, to assign a specific layer or slave, in the deployment_id text box, enter the deployment ID for the VNF layer/slave you are scaling-in, and leave all other default values. You can find this deployment ID at the top of the VNF layer/slave deployment page:

    _images/vnflayer-deploy-id.png

    This workflow destroys layer 2 in data center-1 where the capacity need has decreased. Now you have one layer in data center-1 and three layers in data center-2, returning to your originally purchased, four-layer capacity.

    _images/scale-in-move.png

    Important

    To avoid purchasing more capacity than your original purchase, coordinate the timing of your layer deprecation, so your additional (fifth) layer in SA-2 (in step 1) does NOT exceed the 48-hour grace period.

Upgrade BIG-IPs in a VNF group

You can upgrade both VNF and DAG groups. In this example, you will upgrade your BIG-IPs in your VNF group from version BIGIP-13.1.0.5 to version BIGIP-13.1.0.7. Manually upgrading involves executing the following workflows:

  • Upgrade Start
  • Upgrade
  • Admin state disable
  • Scale in
  • Upgrade Finish
_images/upgrade-wf.png

Important

PREREQUISITES:

  • In your VIM project (for example, OpenStack), you must upload the new BIG-IP image (for example, BIGIP-13.1.0.7) to which you are upgrading PRIOR to performing this workflow scenario. Point your browser to BIG-IP 13.1.0.X for F5 image downloads.

  • This upgrade process makes a copy of the VNF group being upgraded (including all layers); therefore, you must have sufficient vCPU and storage capacity to temporarily sustain two VNF groups. Otherwise, your upgrade workflow will fail.

    Tip

    If you lack the required resources in the service area being upgraded, you can utilize the 48-hour grace period for deploying extra layers and avoid failure by temporarily scaling out layers in another service area, and then scaling in layers in the VNF group being upgraded. After the upgrade completes, you can redistribute the VNF layers amongst the service areas, accordingly. See the previous workflow scenario for complete steps.

  1. In VNF Manager, click the Deployments blade, click the VNF_group deployment you want to upgrade, at the top of the window click Execute workflow, and then click Upgrade Start.

  2. On the Execute workflow upgrade_start popup window, in the data text box, enter the dictionary parameters (in JSON format) for the VNF group you want to upgrade using the image ID for the new image to which you want to upgrade (for example, BIGIP-13.1.0.7-0.0.1.ALL_1SLOT). The image value is case-sensitive and must match the image name as entered in your VIM project.

    _images/wf-upgrade-start.png

    You can find this dictionary in YAML format in your inputs file, for example in OpenStack:

    sw_ref_vnf:
      data:
          image: BIGIP-13.1.0.7-0.0.1.ALL_1SLOT
          flavor: m1.xlarge
          availability_zone: nova
    

    Convert the previous YAML dictionary to JSON format, for example:

    { "image": "BIGIP-13.1.0.7-0.0.1.ALL_1SLOT", "flavor":"m1.xlarge", "availability_zone":"nova" }
    
  3. In the revision text box, increment that value by at least 1, leave all other default values, and then click Execute.

    This workflow defines the image which to upgrade the selected group. To verify the status of this workflow, click the VNF_group deployment, and scroll down to the Deployment Executions pane and in the Upgrade Start workflow row, the status column should display, Complete.

    _images/upgrade-start.png
  4. In VNF Manager, click the Deployments blade, click the VNF_group deployment you want to upgrade, at the top of the window click Execute workflow, and then click Upgrade.

  5. On the Execute workflow upgrade popup window, in the deployment_id text box enter the deployment ID of the layer you want to upgrade. To find the layer ID, on the Deployments blade, click the VNF_layer being upgraded and at the top of the page, copy the ID.

    _images/vnflayer-deploy-id.png

    This workflow creates a copy of the group and all layers within that group, running the new version of the BIG-IP image defined in step 2. To verify the status of this workflow, click the VNF_group deployment, and scroll down to the Deployment Executions pane and in the Upgrade workflow row, the status column should display, Complete.

    _images/upgrade.png

    Important

    At this point you will want to leave both VNF layers running, to verify that the upgraded copy is running successfully. The duration will vary depending upon your organization’s standard operating procedures. If you experience problems with the upgraded layer, you can rollback the upgrade by running the Admin state disable workflow (see next step) on the new, upgraded copy of the VNF layer.

  6. In VNF Manager, click the Deployments blade, click the VNF_layer you are upgrading, at the top of the window click Execute workflow, and then click Admin state disable.

    Tip

    To find the layer ID of the old layer you are scaling in, click the Deployments blade, click the VNF_group being upgraded, scroll down to the Nodes pane, click the layer_id row, and the old layer will appear first in the list. Using the first layer ID in the list, on the Deployments blade search for the layer ID. Click that layer and at the top of the window, copy that ID.

    This workflow bleeds new traffic off the older VNF group being upgraded and moves new traffic to the newly upgraded copy of the VNF group. Allow enough time for existing transactions to complete, before executing the Scale In workflow (step 7). To verify the status of this workflow, click the VNF_layer deployment, and scroll down to the Deployment Executions pane and in the Admin state disabled workflow row, the status column should display, Complete.

    _images/ASD-upgrade.png
  7. To scale in the old VNF layer, on the Deployments blade, click the old VNF group (running the old version of BIG-IP), at the top of the window click Execute workflow, select Scale In, enter the deployment_id for the old layer using the following format, and then click Scale In.

    ["gilanTestUG_vnf_group_f00jl8_vnf_layer_90ew6m_layer_id_q5dm8i"]
    

    Tip

    To find the layer ID of the old layer you are scaling in, click the Deployments blade, click the VNF_group being upgraded, scroll down to the Nodes pane, click the layer_id row, and the old layer will appear first in the list. Using the first layer ID in the list, on the Deployments blade search for the layer ID. Click that layer and at the top of the window, copy that ID.

    This workflow destroys the old layer running the old version of BIG-IP. Now you have one upgraded layer, running the new version of BIG-IP. To verify the status of this workflow, click the VNF_layer deployment, and scroll down to the Deployment Executions pane and in the Scale In workflow row, the status column should display, Complete.

    _images/upgrade-scale-in.png
  8. In VNF Manager, click the Deployments blade, click the VNF_group deployment you are upgrading, at the top of the window click Execute workflow, and then click Upgrade Finish.

  9. On the Execute workflow upgrade_finish popup window, leave all other default values, and then click Execute.

    This workflow clears the upgrade definition form you completed in Step 1, the Upgrade Start workflow. To verify the status of this workflow, click the VNF_group deployment, and scroll down to the Deployment Executions pane and in the Upgrade Finish workflow row, the status column should display, Complete.

    _images/upgrade-finish.png

Post auto-heal process

If deploying the Gi LAN or Gi-Firewall blueprint, the Heal workflow will run automatically on a VNF layer, DAG layer, or slave deployment, when nodes become non-responsive or lose connectivity with the VNF master node.

  1. When a heal workflow runs automatically, the heal started indicator will appear on the Deployments blade, in the VNF_layer/slave_ID deployment type row:

    _images/auto-heal.png

    You can also see when the heal workflow runs automatically on the Dashboard -> Executions pane:

    _images/auto-heal-executions.png
  2. On the Deployments blade, find the slave or the layer deployment that was healed, click the healed deployment to open it, and then scroll down to the Nodes pane.

  3. In the Nodes pane, click the ve row, and if the heal ran successfully, you will see two slave/layer instances listed; the old and the new instance.

    _images/auto-heal-ve.png
  4. To purge the old instance, scroll to the top of the Deployment page, click Execute workflow, and then select Purge from the list.

    _images/auto-heal-purge.png
  5. On the popup menu, leave all default values, and click Execute. This workflow will bleed (like Admin State Disable) traffic off the old instance, remove it from the layer, leaving you with only the new instance.

    _images/auto-heal-postpurge.png

Promote the secondary BIG-IQ during an HA-pair failover

If you deploy the BIG-IQ blueprint in an HA pair and y our primary BIG-IQ falters, then you can promote the secondary BIG-IQ to manage the BIG-IP devices. Do the following to promote and fail over the management of resources and service layers:

  1. On the Deployments blade, click the BIG-IQ deployment, at the top of the window click Execute Workflow, and then select Promote.

  2. Once the promote workflow completes, click the BIG-IQ deployment, click Execute workflow, and then select Update from the list.

    This workflow updates the mgmt IP address assigned to the BIG-IQ deployments. If the primary BIG-IQ fails, then both the primary and secondary deployments become standalone deployments, destroying the HA-pair. The secondary BIG-IQ takes the mgmt IP address of the failed primary BIG-IQ.

Update CGNAT LSN pools with more IP space

When you enabled CGNAT, you defined LSN pools with ranges of IP addresses your system will use during orchestration. When you approach the exhaustion threshold of those defined address ranges, you can update the LSN pools with additional IP space using the guilabel:Update cgnat IP workflow.

Tip

To set up an alert to notify you when your system approaches the exhaustion threshold value (for example, 80% of addresses used), then use the REST API to poll the VNFM input value for this threshold value.

  1. On the Deployments blade, click the main Gi-LAN or Firewall deployment, scroll to the top of the Deployment page, click Execute workflow, and then select Update cgnat IP from the list.
  2. On the popup menu, enter the CGNAT IP range using JSON format; for example, ‘192.168.1.100-192.168.1.150’ and ‘192.168.1.155-192.168.1.160’.
  3. Click Execute.

Enable CGNAT after solution deployment

When you have already launched a Gi-LAN or Firewall solution blueprint and you want to enable CGNAT, you can do so by updating your AS3 Declaration, and then executing the Enable CGNAT workflow.

  1. Open your local inputs file that you deployed for the existing Gi-LAN or Firewall blueprint, edit the AS3 declaration, specifically the policyNAT declaration. For more information, consult the Schema Reference.
  2. In your VNF Manager, click the NSD_VNF deployment, scroll to the top, and then click Execute Workflow
  3. Select Update AS3 from the list, and then click Execute.
  4. In VNF Manager, click the main blueprint Gi-LAN or Firewall solution, scroll to the top, and then click Execute Workflow.
  5. Select Enable CGNAT from the list, provide the following parameter definitions, and then click Execute:
    • increment_ip_number - Enter the value by which your IP addresses are added to your deployment, when you run the Increment IP workflow. Default value is 2.
    • ip_ranges_list - Enter the IP address range in JSON format for each LSN pool list (for example, ‘192.168.1.100-192.168.1.150’ and ‘192.168.1.155-192.168.1.160’)
    • starting_ip_number - Enter the number of IP addresses initially assigned to each VNF VE. Default value is 5.
    • cgnat_resource_id - Enter the reference/pointer to your NAT source translation pool that you want VNFM to manage and that you defined in your AS3 declaration (policyNAT). For example, “/Sample_22/A1/”.

What’s Next?